Project Team
Architect:
Jeffrey Berman Architects
Structural Engineer:
Severud Associates
MEP Engineer:
Goldman Copeland
Construction Manager:
H.M. Hughes
Project Data
Project Type:
Imaging
Project GSF:
2,000
Highlights
Renovation of Interventional Radiology Procedure Room and installation of state-of-the-art GE robotic C-arm.
LPE provided project management services overseeing the renovation and reconfiguration of the Interventional Radiology Lab to accommodate a state-of-the-art robotic C-arm provided by GE. This was brand new technology and the first installation of this equipment in New York City. The project required the installation of a special static dissipative epoxy floor level to within 1/16th of an inch. Project was completed in an existing IR suite, maintaining continuity of service for the duration of the project.