New York Presbyterian

Weill Cornell 3 Tesla MRI

Project Team

Architect: Jeffrey Berman Architects
Structural Engineer: Severud Associates
MEP Engineer: Goldman Copeland
Construction Manager: Skanska, USA

Project Data

Project Type:
Imaging

Project GSF:
3,000

Highlights

Installation of GE 3T MRI to an existing 2 Unit MRI suite. Reconfiguration and renovation of radiology staff lounge and delivery path to provide a permanent pathway for future magnet swap outs.

The project included a gut renovation of a shell space that had been left unoccupied during the initial buildout of the suite, as well as renovation of a common control room area and equipment space. The two other MRIs in the suite remained in uninterrupted service throughout the course of the project. A nearby radiology staff lounge was gut renovated and reconfigured to provide delivery access for this MRI and all future MRIs, drastically reducing delivery time and interruption to hospital operations during equipment delivery. Work was executed on time and under budget. The MRI suite and the adjacent clinical areas were kept in service during the duration of the project.

LPE Management Services, LLC. has become a PMA company,
effectively expanding our capabilities and providing clients
with broader national reach and combined expertise with resources in
Austin, Chicago, Los Angeles, New York, Orlando, San Diego, and San Francisco.